Page Industries (Jockey) Placement Guide
Innerwear & Apparel (Jockey/Speedo) · Bengaluru, India · ~21,200 employees · Founded 1994
Page Industries is the exclusive Indian licensee of Jockey (and Speedo), a market leader in premium innerwear and athleisure. A coveted manufacturing, sales and management-trainee recruiter.
Page Industries (Jockey) is a company in Innerwear & Apparel (Jockey/Speedo), headquartered in Bengaluru, India and founded in 1994. Its main segments are Men’s & Women’s Innerwear (Jockey), Athleisure & Loungewear, Swimwear (Speedo). Typical compensation for campus hires: ₹10 – 20+ LPA (management trainee); sales/ops ₹6–10 LPA. Below you will find the business model, roles and eligibility, SWOT, competitors, industry outlook and interview process for Page Industries (Jockey), so you can prepare for your Page Industries (Jockey) placement interview with context rather than guesswork.
Last updated 2026-10-25
Open Interactive AI Coach & Checklist for Page Industries (Jockey) →
Business Model
The premium innerwear and athleisure leader (Jockey), with strong brand, distribution and execution.
Revenue streams
- Men’s & women’s innerwear (Jockey)
- Athleisure & loungewear
- Swimwear (Speedo)
- Distribution & retail
Key products
- Jockey innerwear
- Athleisure & loungewear
- Speedo swimwear
- Socks & accessories
Customers
- Premium innerwear consumers
- Athleisure buyers
- Modern trade & e-commerce
- Tier 1–3 India
Salary & Roles
₹10 – 20+ LPA (management trainee); sales/ops ₹6–10 LPA
Roles typically hiring for
- Graduate Engineer Trainee (GET)
- Diploma / Production Trainee
- Quality / Process Engineer
- Supply Chain / Operations Trainee
- R&D / Design Engineer
Eligibility criteria
Mechanical/Electrical/Production/Industrial/Automobile engineering (and allied) typically 60%+ / 6.5+ CGPA, no active backlogs. Aptitude + core technical screening.
Hiring timeline
On-campus GET hiring Aug–Dec; plant-level drives year-round. Offer to joining: 2–6 months.
Skills to prepare
Core engineering fundamentals (thermo, SOM, manufacturing processes)Engineering drawing & GD&TQuality tools (7 QC tools, Six Sigma basics)Lean / production systemsProblem-solving & root-cause analysisCAD / domain software
SWOT Analysis
Strengths
- Premium innerwear leadership (Jockey)
- Strong brand & distribution
- High margins & ROCE
- Athleisure tailwind
Weaknesses
- Premium-price sensitivity
- Cotton/commodity exposure
- Licence dependence (Jockey)
- EBITDA margin down to 20.3% from 22.4% on input-cost inflation
Opportunities
- Premiumisation & athleisure
- Women’s innerwear
- E-commerce
- Tier 2–4 growth
Threats
- Competition (Modenik/Lux/Van Heusen)
- Commodity inflation
- Demand cycles
- Licence terms
Competitors
Modenik (Enamor/Dixcy) Rival
Innerwear.
Lux/Rupa Rivals
Value innerwear.
Van Heusen Innerwear Rival
Premium.
Zivame Rival
Women’s lingerie.
Industry Intelligence
Innerwear is premiumising and athleisure is growing; Page leans on Jockey’s premium leadership, brand and distribution.
Key trends
- Premiumisation
- Athleisure
- Women’s innerwear
- E-commerce
Outlook
Q1 FY27 (Apr–Jun 2026): revenue +7.9% to ~₹1,420 cr (volume +5.7%), but net profit fell ~4% to ~₹193 cr as EBITDA margin slipped to 20.3% (from 22.4%) on cotton and synthetics inflation; ₹200 interim dividend declared and the shares slipped ~4.6%.
Jockey
Brand
Premium leader
Interview Process
Stage-by-stage, with tips and sample questions
1
Aptitude + Technical Online Test
Quantitative aptitude, logical reasoning, and a core-engineering technical section on your branch fundamentals.
Tips
- Revise core subjects (thermodynamics, SOM, manufacturing, machine design)
- Practice aptitude and engineering-maths
- Brush up units, formulae and basic numericals
Sample questions
- Stress-strain / bending numerical
- Thermodynamics cycle question
- Manufacturing process MCQ (casting/welding/machining)
- Quantitative aptitude set
2
Technical Interview
Deep dive into core engineering, your projects, internships and design/process understanding.
Tips
- Know every project and internship on your resume
- Revise GD&T, tolerances and material properties
- Relate concepts to real shop-floor/plant scenarios
Sample questions
- Explain the working of a 4-stroke engine.
- What is GD&T and why is it used?
- Difference between casting and forging.
- Walk me through your final-year project.
- What are the 7 QC tools?
3
Technical HR / Group Task
Group discussion or a practical problem assessing teamwork, safety mindset and applied thinking.
Tips
- Show a safety- and quality-first mindset
- Be collaborative in group tasks
- Connect theory to manufacturing practice
Sample questions
- How would you reduce defects on a production line?
- Discuss: automation and the future of manufacturing jobs.
- How would you improve OEE in a plant?
4
HR Round
Communication, willingness to work in shifts/plant locations, and culture fit.
Tips
- Be open to plant locations and rotational shifts
- Show genuine interest in core engineering
- Prepare a crisp self-introduction
Sample questions
- Why core/manufacturing and not IT?
- Are you comfortable working at a plant location?
- Tell me about yourself.
- How do you handle working in a team on the shop floor?
Interview questions to practise
HR round questions to practise for Page Industries (Jockey)
- Why manufacturing / core engineering and not software?
- Are you willing to work in shifts and at plant locations?
- Tell me about yourself.
- How do you handle pressure on a production line?
- Why our company?
Technical round questions to practise for Page Industries (Jockey)
- Explain the working of an IC engine.
- What is GD&T?
- Difference between casting, forging and machining.
- What are the 7 QC tools / explain Six Sigma DMAIC.
- Define stress, strain and factor of safety.
Case / business round questions to practise for Page Industries (Jockey)
- How would you reduce rejection rate on a line?
- Improve the OEE of a bottleneck machine.
- Reduce cycle time without adding cost.
Behavioural round questions to practise for Page Industries (Jockey)
- A time you solved a hands-on technical problem.
- A time you worked in a team to meet a deadline.
- How you ensured quality/safety in a project.
Related company placement guides
Companies in a similar space, with the same level of detail